Project

General

Profile

Actions

BUG #4167

open

BUG #4242: [SQA] : Agency Authentication

BUG #4243: [SQA]: UI >> Agency Authentication

[SQA] Error state color for invalid credentials does not match Lovable design on Admin Sign In

Added by Tasfia Zaima 2 months ago. Updated 30 days ago.

Status:
Complete
Priority:
High
Assignee:
Target version:
Start date:
02/03/2026
Due date:
% Done:

100%

Estimated time:

Description

Issue Description
On the Admin Profile Sign In page in the staging environment, after entering invalid credentials and clicking the Sign In button, the input field border hover effect and the associated alert/error text messages are displayed in red.
However, according to the Lovable design, these error and hover states should appear in a yellowish color, resulting in a visual inconsistency between design and implementation.

Module / Page
Admin Profile → Sign In

Module Section
Input Field Validation / Error State Styling

Screen Size
Desktop

Tested By
Tasfia Zaima


Steps to Reproduce

  1. Navigate to the Admin Profile Sign In page.
  2. Enter invalid email and password credentials.
  3. Click the Sign In button.
  4. Observe the input field border hover effect and alert/error text color.
  5. Compare the behavior with the Lovable design.

Expected Result
After entering invalid credentials, the input field border hover effect and associated alert messages should appear in a yellowish color, as specified in the Lovable design.

Actual Result
The input field borders and alert/error text messages appear in red in the staging environment.

Attachments
PoC

Types of Issue
UI Issue


Root Cause:
mismatch with lovable

Impacted Area:
signin page

Actions #1

Updated by Nazmul Hossain Shovon 2 months ago

  • Assignee changed from Ayat Rahman to Nazmul Hossain Shovon
Actions #2

Updated by Nazmul Hossain Shovon 2 months ago

  • Parent task set to #4243
Actions #3

Updated by Nazmul Hossain Shovon about 2 months ago

  • Description updated (diff)
  • Status changed from Pending to In Progress
  • Assignee changed from Nazmul Hossain Shovon to Tasfia Zaima
  • % Done changed from 0 to 100
Actions #4

Updated by Tasfia Zaima 30 days ago

  • Status changed from In Progress to Complete
Actions

Also available in: Atom PDF