Project

General

Profile

Actions

ClientProject #3723

open

[TAM TRADING FZ LLC] - Product, Packaging & UoM Model Setup in Odoo

Added by Shafiuddin Haider 5 months ago. Updated 5 months ago.

Status:
In Progress
Priority:
High
Start date:
11/25/2025
Due date:
% Done:

20%

Estimated time:
6:00 h

Description

Goal / Story:

As TAM SCM, I want a correct product + packaging + UoM structure so that purchasing, stock, bagging, FEFO, and HS-code-based compliance can work correctly across all chemicals.

Key points:

  • Multiple packaging types per product (jumbo bags, 25kg bags, gallons, fiberglass rolls) and custom packing per customer
  • Bulk → bags conversion, with standard loss % to be tracked at bagging & delivery
  • Need UoM conversion MT → bags → pallets and packaging compatibility rules (e.g. soda ash → jumbo / 25kg)
  • Batch/lot & FEFO based on expiry; HS code per material

Tech Tasks:

  • Configure Units of Measure:
    • Base UoM: MT.
    • Secondary UoM categories for bags, jumbo bags, pallets, etc.
    • Define conversion ratios (e.g. X bags per MT, Y MT per pallet).
  • Extend Product Template:
    • Enable Lots/Expiration tracking where required.
    • Fields for HS Code, standard loss %, packaging type(s) allowed.
    • Flag for FEFO applicable.
  • Create Packaging Master:
    • Define “Packaging Type” master (Jumbo, 25kg, Gallon, Roll, etc.).
    • Many2many relation: Product ↔ Allowed Packaging Types.
  • Add Customer-specific packaging option:
    • On Sales Order line: packaging type selection limited by product rules, but override allowed when needed (configurable).

Acceptance Criteria:

  • User can create Soda Ash product with:
    • HS code, FEFO enabled, expiry duration.
    • Allowed packagings: Jumbo, 25kg.
    • UoM conversion from MT → bags visible & working in a test SO/PO.
  • System prevents selecting an invalid packaging for a product unless explicitly overridden by an admin.
  • Test scenario: 1 MT → correct number of bags / pallets shown on documents.
Actions #1

Updated by A.N.M Mohaimen Shanto 5 months ago

  • Status changed from Pending to In Progress
  • Assignee set to A.N.M Mohaimen Shanto
  • Target version set to [Sprint 2]Requirement Analysis & Development
  • % Done changed from 0 to 20
  • Estimated time set to 6:00 h
Actions

Also available in: Atom PDF