Actions
ClientProject #2973
openClientProject #2933: Release Notes for Revamp.v1.1 (Sprint 02)
Release Notes for Revamp.v1.1 (Sprint 02) Final
Description
Release of Revamp.v1.1 (Sprint 02)
Site URL: "https://staging.pqsjapan.jp/"
Duration: 10 days (08/08/2025 to 21/08/2025)
Release date: 21/08/2025
Team Members:
Frontend: Sajib Ahmed, Lutfor Rahman Shimanto, Nazmul Hossain Shovon
DevOps: Al Arafat Siddique
Features & Enhancements
UI Design :
- Layout Design: Implemented layout for all key pages including Home, Stock, Back Order, Truck Stock, and Korean Stock.
- Header Design: Header created with logo, navigation, and search section (UI only).
- Footer Design: Footer designed with actual links and key information.
- Left Sidebar Design: Sidebar structure implemented for maker, models, body types, price and transmission.
- Breadcrumb Setup: Added breadcrumb navigation structure for better user flow.
- Product Listing with Pagination: Product listing and pagination structure implemented.
- Responsive Design: Initial responsive design applied for desktop(1920px), laptop(1440px), tablet(768px), and mobile(375px) layouts.
API Integration :
- Home Module: Connected products, left sidebar api and right sidebar countries api.
- Stock Modules: Connected APIs for Stock, Back Order, Truck Stock, Korean Stock and left sidebar.
- Products API: Integrated products API with pagination for listing view.
- Footer Maker Links: Integrated API for displaying maker and body types links in the footer.
- Dynamic Pages: Connected apis for maker,model,body type,price and transmission
Known Issues
- Header
- Search API not yet provided.
- Signup and login not functional.
- Banner not responsive on mobile and tablet.
- Home
- Right sidebar requires API integration.
- Newsletter subscription not functional.
- Product Details
- Product details page design and functionality not yet implemented.
- Filters
- Filter Ui & functionality not yet implemented.
- Some product images, maker, body type & icons are not available from api response
Actions